Monday, April 18, 2022

Pavement Sealing Work Planned in St. Clair, Henry and Hickory Counties

Pavement Sealing Work Planned in #StClair, #Henry & #HickoryCo Beginning Week of April 18th.

Drivers should expect one lane traffic, flaggers and pilot cars where contractor crews are sealing various routes in St. Clair, Henry and Hickory counties with a mixture of rock and oil beginning the week of April 18th.

Contractor crews will remove the current driving surface on these routes, replacing it with a new surface with improved texture.

Here is the anticipated schedule and the routes impacted:
• April 19-20 – St. Clair County Route HH between
Northeast 971 And Route C east of #LowryCity
• April 20-28 – St. Clair County Route V between Missouri
Route 13 and U.S. Route 54 south of #Osceola
• April 28-May 2 – St. Clair County Route MM between
Southeast 1151 and U.S. Route 54 west of #Weaubleau
• May 3-5 – Hickory County Route RB between Missouri
Route 83 and Lightfoot Park east of #Flemington
• May 10-16 – Hickory County Route VV between Route P
east of #CrossTimbers and Missouri Route 7 in #BentonCo
• May 18-16 – Henry County Route P between Missouri
Route 18 and Southwest 350 north of #Montrose

Traffic Impacts:
• Traffic reduced to one lane where contractor crews
are working
• Drivers are urged to use caution and reduce their speed
when traveling over recently-sealed sections of highways
• No signed detours
• Signs and message boards will alert drivers to the
work zone
• Drivers are urged to look for alternate routes

Drivers will encounter flaggers and pilot cars directing them through the work zones. 

Drivers should wait for the pilot vehicle before proceeding through the work zones or before entering the work zones from a side road.

Weather and/or scheduling delays will alter the work schedule.

Search news